What to include in a statement of work (SOW)
A statement of work describes one project under a master agreement. It is where most project disputes start, usually because something was vague. These sections prevent that.
Start with a statement of work — free See the Word template
1. Reference to the master agreement#
Name the master services or consulting agreement the SOW sits under, and say which document wins if they conflict. Legal terms such as liability and intellectual property belong in the master agreement, not in each SOW.
2. Scope and objectives#
What the project is for, and what is out of scope. An explicit "out of scope" list is the cheapest protection against scope creep.
3. Deliverables#
Each deliverable with a description specific enough to test: "a responsive five-page website with a contact form", not "a website". Add a due date for each.
4. Timeline and milestones#
Key dates, and which ones depend on the client providing content, access or feedback.
5. Fees and payment#
Fixed price with a payment schedule tied to milestones, or time and materials with rates and an estimate or cap. Include expenses and payment terms.
6. Assumptions and client responsibilities#
What the price assumes: number of revision rounds, access to systems, response times for feedback. When an assumption proves wrong, it becomes the basis for a change request.
7. Acceptance#
How deliverables are reviewed, how long the client has, and what happens if they do not respond. "Deemed accepted after ten business days" avoids projects that never formally finish.
8. Change control#
How changes are requested, priced and approved in writing. See the amendment clause.
Write SOWs in minutes#
The free statement of work template lists any number of deliverables with due dates, switches between fixed price and time and materials, and includes assumptions and acceptance. Answer the questions in Clausery and download a finished Word SOW. For the master terms, start with the service agreement or consulting agreement.
Download a starter template#
Questions
Who writes the statement of work?
Usually the supplier drafts it from the client brief, then both sides agree it before work starts. The client should check that the deliverables, assumptions and acceptance criteria match what was agreed commercially.
Is a statement of work a contract?
It becomes one when both sides agree it and it sits under a master agreement or contains the essential terms. Many SOWs incorporate a service agreement by reference; if there is no master agreement, include payment, termination and liability terms in the SOW or a separate contract.
What happens when the scope changes?
Use a written change request: what is changing, the effect on fee and timeline, and who approves it. A SOW with change control avoids the choice between doing unpaid work and damaging the relationship.
More on freelancing and getting paid
- Freelance Contract: 10 Clauses to Include
- How to write a photography contract
- How to write a cleaning services contract
- What to include in a tutoring agreement
- How to write an independent contractor agreement
- How to write a purchase order (with an example)
- Quote vs Estimate vs Invoice: What to Send
- How to Write an Invoice (2026): 7-Step Checklist
- What Is a Kill Fee? (And How to Set One)
- Client Won't Pay? 7 Steps to Get Paid
- Demand Letter for Unpaid Invoices (Free)
- What is a change order? How to handle scope changes
- What is a credit note? When to issue one, what it must say
- What a VAT Invoice Must Include (UK)
- GST/HST Invoice Requirements (Canada)
- Tax Invoice Requirements (Australia: 7 Details)
- Bank Details on an Invoice (Stop Fraud Too)
Helpful?